Construction of 330 kV transmission substation Bitenai. End user Litgrid, AB
Construction of Bitėnai switchyard at the
border with Kaliningrad was a strategic site for Lithuania. The switchyard is
necessary for consumers in Western Lithuania to receive electricity through the
grid located in Lithuania. So far power lines at Bitenai were stretched from
Lithuania to Kaliningrad region and from there - to Lithuania.
Main contractor was Empower, UAB they choose Aedilis, UAB as their subcontractor for telecommunications, RTU and relay
protection parts;
Telecommunications:
Aedilis, UAB did a detailed design for SDH and
PDH networks, which was used to transmit data to SCADA system;
All installation and configuration works were
completed by our team;
We supplied all equipment for telecommunications;
RTU:
In this substation we were programming and
commissioning a Siemens Sicam AK 1703 ACP controller with data collection by
IEC 61850 protocol.
Relay protection and automation:
Aedilis, UAB in this project did part of relay
protection and automation commissioning works. The Siemens 6MD6641, 7SJ6471
relays were configured using IEC 61850 protocol;
|
|
  
|